Sanroc Inc. founded in 1982 is a contracting and excavating company. Joyce Fegert has been with the company since it started and has been the owner and president since 1997. Sanroc prides itself with quality work, safety and a track record of satisfied costumers.
Experience | References |
---|---|
Site Work | Albemarle Corp. |
Road Construction | Ireland Gold Corp |
Hauling | Scorpio Gold Corp |
Utilities | |
Excavation |
Management Team:
Keith Fegert - General Manager 775.622.7403 (kfegert@sanrocinc.com)
Rob Wethern - Operations. 775.771.8219 (rwethern@sanrocinc.com)
Brandon Balkenbush - Engineering. 775.250.6600. (brandon@sanrocinc.com)
Larry Eilers - Safety and Strategy. 702.533.7775. (leilers@sanrocinc.com)
Recently Completed Projects:
The following is a list of projects completed in Silver Peak Nevada over the last several years. A brief description of each has been given.
Salt Harvesting and Liner Installation, Pond 9-West (2023) Salt removal exceeded 20,000 cubic yard per day
Establish preapproved traffic control plan. Trench salts to clay surface and install submersible portable pump into strategically placed sumps. Pump brine to designated ponds. Widen and grade roads as necessary and establish appropriate berms and height. Clean up and prepare dump site as necessary with appropriate berms. Rip approximately 2’ in depth of salt and push material into stockpiles. Load and haul material to dumpsite and spread material. Maintain road and control dust as necessary.
Salt Harvesting and Liner Installation, Pond 5 (2023) Salt removal exceeded 12,000 cubic yard per day
Establish preapproved traffic control plan. Trench salts to clay surface and install submersible portable pump into strategically placed sumps. Pump brine to designated ponds. Widen and grade roads as necessary and establish appropriate berms and height. Clean up and prepare dump site as necessary with appropriate berms. Rip approximately 2’ in depth of salt and push material into stockpiles. Load and haul material to dumpsite and spread material. Grade slopes of dike and cap with clay material. Excavate anchor trench to a minimum of 2’ wide and 3’ deep. Install liner (Subcontractor), backfill anchor trench and compact. Maintain road and control dust as necessary.
Salt Harvesting and Liner Installation, Pond 1-East & West (2021)
Establish preapproved traffic control plan. Trench salts to clay surface and install submersible portable pump into strategically placed sumps. Pump brine to designated ponds. Widen and grade roads as necessary and establish appropriate berms and height. Clean up and prepare dump site as necessary with appropriate berms. Rip approximately 2’ in depth of salt and push material into stockpiles. Load and haul material to dumpsite and spread material. Remove all existing Riprap as necessary. Grade slopes of dike and cap with clay material. Excavate anchor trench to a minimum of 2’ wide and 3’ deep. Install liner (Subcontractor), backfill anchor trench and compact. Maintain road and control dust as necessary.
Salt Harvesting, Pond 9-West (2018)
Establish preapproved traffic control plan. Trench salts to clay surface and install submersible portable pump into strategically placed sumps. Pump brine to designated ponds. Widen and grade roads as necessary and establish appropriate berms and height. Clean up and prepare dump site as necessary with appropriate berms. Rip approximately 2’ in depth of salt and push material into stockpiles. Load and haul material to dumpsite and spread material. Maintain road and control dust as necessary.